Resource estimation, mine planning, and operational risk for mining projects
Measured/Indicated/Inferred — quantified, not just labelled.
Feasibility NPV is $180M. The P10 is -$40M.
The optimal COG changes with the price you can't predict.
Availability × utilization × recovery: three multiplicative uncertainties.
Gold, copper, silver — correlated price paths.
Your optimal pit changes shape at different prices.
Low probability, catastrophic consequence.
Is the next $5M of drilling worth it?
Column test: 72%. Actual heap: 58%. The scale-up gap.
Supply vs demand under climate uncertainty.