Your feasibility NPV is $180M. The P10 is -$40M. Both are true.powered by Vose Software
← Mining calculators

Every feasibility study reports a single NPV. But the range of possible outcomes spans from write-off to bonanza.

A mining feasibility study typically presents a base case NPV, then adds a few sensitivity tables showing "NPV at $1,800/oz" and "NPV at $2,200/oz." This one-at-a-time analysis systematically understates risk because it never considers the scenario where gold price drops AND grade is lower than expected AND recovery is poor AND costs escalate — all simultaneously. The probability of multiple inputs going wrong together is much higher than intuition suggests.

The consequence: mines are built based on NPVs that assume everything goes to plan. When reality hits — as it always does — the project underperforms, often dramatically. A 2020 study by McKinsey found that 80% of mining megaprojects exceeded their budgets by more than 25%.

Why this requires Monte Carlo simulation

Mine NPV = Σ (Production(t) × (Price(t) - Cost(t)) × (1+r)^-t) over a 10-20 year mine life. Production depends on uncertain grade, tonnage, and metallurgical recovery. Price follows a stochastic path. Costs are affected by energy prices, labor markets, and forex. These inputs are correlated — high commodity prices often coincide with high energy costs and labor inflation. The NPV is a highly nonlinear function of all these interacting uncertainties, with no closed-form solution. Simulation is the only way to see the full NPV distribution.

Mine parameters
Mineral resourceMt
Average gradeg/t Au or % Cu
Processing rateMtpa
Recovery%

Economics
Commodity price$/oz or $/lb
CAPEX$M
OPEX (all-in sustaining)$/oz or $/lb
Discount rate%
Royalty + tax%

Enter your mine parameters and run the simulation.