Your resource model says 2.1Mt at 1.8 g/t. The confidence interval is ±40%.powered by Vose Software
← Mining calculators

Measured, Indicated, and Inferred aren't just labels. They're statements about how wrong you might be.

The JORC/NI 43-101 classification system divides mineral resources into Measured (high confidence), Indicated (reasonable confidence), and Inferred (low confidence). But the confidence levels behind these categories are rarely quantified. A "2.1 million tonnes at 1.8 g/t Au" resource estimate hides enormous uncertainty in both tonnage and grade — particularly for the Indicated and Inferred portions where drill spacing is wide.

The contained metal (tonnes × grade × recovery) is what drives economics, and it's a product of three uncertain quantities. A 20% overestimate in tonnage × 15% overestimate in grade = a 38% overestimate in contained metal. This multiplicative error is the primary reason mining projects underperform feasibility studies.

Why this requires Monte Carlo simulation

Contained metal = Tonnage × Grade × Recovery. Each component is uncertain, and the uncertainties vary by resource classification: Measured blocks might have ±10% grade uncertainty, while Inferred blocks have ±40%. The total resource is the sum across all blocks and classifications, with the uncertainty of each block depending on the drill data density. The distribution of total contained metal — accounting for the different confidence levels of each classification — has no analytical form. Only simulation properly propagates the uncertainty from block-level grade estimates through to the total resource.

Resource by classification
Enter tonnes (Mt) and grade (g/t) for each category
Measuredhighest confidence
Indicatedreasonable confidence
Inferredlow confidence
±% is the coefficient of variation on grade for each classification

Metallurgical recovery
Recovery%

Metal price$/oz (for revenue calc)