Cut-off grade determines which material is ore and which is waste. It drives the mine plan, the reserve estimate, the processing plant feed, and ultimately the NPV. The textbook formula (Cut-off = Cost / (Price × Recovery × Conversion)) gives a single number at a single price. But the commodity price over a 15-year mine life is profoundly uncertain — and the optimal cut-off should reflect this.
A low cut-off processes more tonnes at lower average grade (maximizes resource utilization). A high cut-off processes fewer tonnes at higher grade (maximizes grade but shortens mine life). The NPV-optimal balance depends on the price path — which is unknown.
For each candidate cut-off grade, the tonnage, average grade, mine life, and economics all change nonlinearly. The NPV at each cut-off depends on the commodity price, which is uncertain. Finding the cut-off that maximizes expected NPV requires evaluating the full NPV distribution at each candidate cut-off — a nested simulation. The optimal cut-off under uncertainty differs from the deterministic optimum because it accounts for the asymmetric risk: mining too low a grade at a low price destroys more value than the upside of mining low grade at a high price.
Enter parameters and optimize.