Most organizations run cost risk and schedule risk analyses separately. But cost and schedule are correlated — longer durations mean more time-related costs (site overhead, equipment rental, management), and cost overruns often signal scope issues that also delay the schedule. An integrated model captures this correlation.
Integrating cost and schedule requires a model where duration drives some costs (time-related) while both share common risk events. The joint distribution of cost and schedule completion has no analytical form — it depends on the specific cost structure, the fraction of time-related vs fixed costs, and the correlation between technical risks affecting both.
Configure and run the integrated model.