Cost and schedule risk aren't independent.powered by Vose Software
← Project Risk calculators

Your cost model says $55M. Your schedule model says 20 months. Together: $62M in 23 months.

Most organizations run cost risk and schedule risk analyses separately. But cost and schedule are correlated — longer durations mean more time-related costs (site overhead, equipment rental, management), and cost overruns often signal scope issues that also delay the schedule. An integrated model captures this correlation.

Why this requires Monte Carlo simulation

Integrating cost and schedule requires a model where duration drives some costs (time-related) while both share common risk events. The joint distribution of cost and schedule completion has no analytical form — it depends on the specific cost structure, the fraction of time-related vs fixed costs, and the correlation between technical risks affecting both.

Project structure
Fixed costs (scope-dependent)$M
Monthly time-related cost$M/month
Project durationmonths
Cost-schedule correlation

Configure and run the integrated model.