Construction claims and disputes involve uncertain quantum — the financial value depends on which cost methodology is accepted (measured mile vs total cost vs modified total cost), which delay analysis technique prevails (as-planned vs as-built vs windows), and the arbitrator's interpretation of concurrent delay. Each methodology produces a different number, and the probability of each being accepted depends on the strength of your documentation.
The settlement value of a claim is a mixture model: P(method₁ accepted) × quantum₁ + P(method₂) × quantum₂ + ..., where each quantum itself is uncertain. The interaction between methodology acceptance probability, quantum uncertainty, and the probability of partial acceptance (where the tribunal applies a percentage reduction) creates a multi-layered probability model that can only be resolved by simulation.