In the Permian, operators present management with a deterministic type curve — one line showing expected production over time. This curve drives EUR estimates, well economics, spacing decisions, and reserve bookings. But the well-to-well variability in IP rate (often ±50-60%) and decline behavior (b-factors ranging from 0.5 to 1.5) means the actual production from any given well could fall anywhere in a wide band around that line.
Worse: as operators move to Tier 2 and Tier 3 acreage, the uncertainty increases because there are fewer offset wells to calibrate against. A type curve built from 50 Tier 1 wells tells you almost nothing about what your Tier 2 well will do. The 2024-2025 data confirms this: new well productivity gains have flattened to less than 2%, meaning the easy improvements are exhausted.
A type curve is built from a decline model: q(t) = IP / (1 + b·Di·t)^(1/b). Both IP and the decline parameters (b, Di) are uncertain. EUR is the integral of this curve — a nonlinear function of three uncertain parameters that interact multiplicatively. A "high IP + fast decline" well can produce the same EUR as a "low IP + slow decline" well, but with very different cash flow timing. Only simulation captures all these interactions and produces the correct EUR distribution — including the crucial P10/P90 ratio that determines reserves classification.
Enter your decline parameters and run the simulation.