Your 5-year forecast is a single line. Reality is a cone.powered by Vose Software
← Oil & Gas calculators

The reservoir simulation gives one production profile. But STOIIP, permeability, and aquifer strength are all uncertain. Where's the cone?

Most producing fields have a single "history-matched" reservoir model that generates a deterministic production forecast. This forecast goes into the business plan as if it were certain. In reality, multiple reservoir models can match the same production history with very different forward predictions — the non-uniqueness problem. Parameters like STOIIP, aquifer influx, and remaining well targets are poorly constrained, especially beyond 3-5 years.

The "cone of uncertainty" widens dramatically with time. A forecast that shows ±5% at year 1 might be ±40% by year 5. Management needs to see this cone, not a single line.

Why this requires Monte Carlo simulation

Production depends on STOIIP (controls how much is left), aquifer strength (controls pressure support), and well productivity (controls offtake rate). These interact nonlinearly through material balance — more aquifer means more pressure support means higher rates but also more water. The production trajectory is a path-dependent function of these parameters, not a simple formula. Simulation samples different parameter combinations and traces the production path for each, building the forecast envelope that a single reservoir model cannot provide.

Current field status
Current production ratekbbl/day
Current water cut%
Cumulative production to dateMMbbl

Reservoir uncertainty
STOIIPMMbbl
Ultimate recovery factor%
Aquifer support factor0=weak, 1=strong

Planned infill wells
Forecast horizonyears

Enter reservoir parameters and generate the forecast envelope.