Most producing fields have a single "history-matched" reservoir model that generates a deterministic production forecast. This forecast goes into the business plan as if it were certain. In reality, multiple reservoir models can match the same production history with very different forward predictions — the non-uniqueness problem. Parameters like STOIIP, aquifer influx, and remaining well targets are poorly constrained, especially beyond 3-5 years.
The "cone of uncertainty" widens dramatically with time. A forecast that shows ±5% at year 1 might be ±40% by year 5. Management needs to see this cone, not a single line.
Production depends on STOIIP (controls how much is left), aquifer strength (controls pressure support), and well productivity (controls offtake rate). These interact nonlinearly through material balance — more aquifer means more pressure support means higher rates but also more water. The production trajectory is a path-dependent function of these parameters, not a simple formula. Simulation samples different parameter combinations and traces the production path for each, building the forecast envelope that a single reservoir model cannot provide.
Enter reservoir parameters and generate the forecast envelope.